It’s that time of year again when beaches are getting ready for summer.

Beach recycling work has already started between Beach Walk and Tankerton Sailing Club.

The dozer and excavator will work their way along each groyne bay regrading the stones, ensuring the beach is in good shape for the busy season ahead.

Work is expected to take around two weeks.

By Ed

©2024 Hawkinge Gazette       -       The Hawkinge Gazette is not responsible for the content of external sites