Essential sea defence work designed to protect coastal homes and businesses against severe 1-in-200-year storm events gets underway along the Folkestone coastline this week.

The bi-annual beach management operation involves shifting and reshaping approximately 100,000 tonnes of shingle between Fisherman’s Beach and Folkestone Harbour over an eight-week period. By recycling and regrading the beach material, team members create a formidable natural barrier to absorb high tides and prevent wave overtopping during extreme weather.

The protective strength of the sea wall defence was demonstrated during severe weather in January, when forceful winds reaching up to 65 mph caused no flooding or damage to nearby residential properties or local businesses.


Folkestone and Hythe District Council Cabinet Member for Climate, Environment and Biodiversity, Councillor Stephen Scoffham, noted that the bi-annual recycling process has been carried out continuously since 2004 and consistently provides robust flood protection for the town.

Council officials also confirmed that repair work on the breakwater following damage sustained during Storm Goretti is scheduled to commence before the end of the year.


©2026 Hawkinge Gazette        -       The Hawkinge Gazette is not responsible for the content of external sites